{"id":604,"date":"2022-06-18T15:32:03","date_gmt":"2022-06-18T12:32:03","guid":{"rendered":"https:\/\/ucc-iraq.com\/?p=604"},"modified":"2022-06-18T16:18:29","modified_gmt":"2022-06-18T13:18:29","slug":"%d9%85%d8%b4%d8%b1%d9%88%d8%b9-%d9%85%d8%b5%d9%81%d9%89-%d8%a8%d9%8a%d8%ac%d9%8a","status":"publish","type":"post","link":"https:\/\/ucc-iraq.com\/?p=604&lang=ar","title":{"rendered":"\u0645\u0634\u0631\u0648\u0639 \u0645\u0635\u0641\u0649 \u0627\u0644\u0634\u0631\u0643\u0629 \u0627\u0644\u0639\u0631\u0628\u064a\u0629 \u0644\u0643\u064a\u0645\u064a\u0627\u0648\u064a\u0627\u062a \u0627\u0644\u0645\u0646\u0638\u0641\u0627\u062a &#8211; \u0628\u064a\u062c\u064a \u0645\u062d\u0627\u0641\u0638\u0629 \u0635\u0644\u0627\u062d \u0627\u0644\u062f\u064a\u0646"},"content":{"rendered":"\n<p><\/p>\n\n\n\n<p>Rehabilitation of THE ARAB COMPANY FOR DETERGENT CHEMICALS\/<br>BAIJI as the main subcontractor of KPS Metal with following works:<br>1 Performance of site activities<br>2 Civil work including steel structure and underground and sewer piping<br>3 Erection of static and rotary equipment, Unit 07<br>4 Erection of static and rotary equipment, Unit 09<br>5 Prefabrication and erection of piping (internal, off-site) erection valves.<br>6 Dismantling and modifications of existing equipment<br>7 Erection of Instrumentation and control<br>8 Erection of electrical parts and installation new cabels.<br>9 Erection of external insulation for equipment including repair coatings<br>10 Erection of external insulation for all pipes including painting<br>11 Pre-commissioning<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Rehabilitation of THE ARAB COMPANY FOR DETERGENT CHEMICALS\/BAIJI as the main subcontractor of KPS Metal with following works:1 Performance of site activities2 Civil work including steel structure and underground and sewer piping3 Erection of static and rotary equipment, Unit 074 Erection of static and rotary equipment, Unit 095 Prefabrication and erection of piping (internal, off-site) erection valves.6 Dismantling and modifications of existing equipment7 Erection of Instrumentation and control8 Erection of electrical parts and installation new cabels.9 Erection of external insulation for equipment including repair coatings10 Erection of external insulation for all pipes including painting11 Pre-commissioning<\/p>\n","protected":false},"author":1,"featured_media":476,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-604","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-1"],"_links":{"self":[{"href":"https:\/\/ucc-iraq.com\/index.php?rest_route=\/wp\/v2\/posts\/604","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ucc-iraq.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ucc-iraq.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ucc-iraq.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ucc-iraq.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=604"}],"version-history":[{"count":5,"href":"https:\/\/ucc-iraq.com\/index.php?rest_route=\/wp\/v2\/posts\/604\/revisions"}],"predecessor-version":[{"id":654,"href":"https:\/\/ucc-iraq.com\/index.php?rest_route=\/wp\/v2\/posts\/604\/revisions\/654"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ucc-iraq.com\/index.php?rest_route=\/wp\/v2\/media\/476"}],"wp:attachment":[{"href":"https:\/\/ucc-iraq.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=604"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ucc-iraq.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=604"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ucc-iraq.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=604"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}